10 Steps to LEAN -- 5

5. Standardize the Work

Standard Work is the foundation for the "Check" part of PDCA. Without it, every employee does the job differently, leading to unpredictable quality.

  • The Mechanics: Use three elements: Takt Time (the pace of demand), Work Sequence, and Standard Inventory (WIP).

  • The Deep Dive: Standards must be created by the people doing the work, not by engineers in an office. They are "living documents" meant to be challenged and improved.

rt of PDCA. Without it, every employee does the job differently, leading to unpredictable quality.

• The Mechanics: Use three elements: Takt Time (the pace of demand), Work Sequence, and Standard Inventory (WIP).

• The Deep Dive: Standards must be created by the people doing the work, not by engineers in an office. They are "living documents" meant to be challenged and improved.


Comments

Popular posts from this blog

The True Architecture of LEAN: Why Eliminating Variability Is the Secret to Scalable Growth

The 5 Lean Principles: Architectural Laws for Eliminating Systemic Cost and Flow Stagnation

The Ultimate Lean Paradox: Why Stopping the Line is the Only Way to Keep It Flowing