The 3 Leveks of Hoshin


The 3 Levels of Hoshin Planning




1. Breakthrough Objectives (3–5 years)



These are big, strategic goals.


Examples:


  • Reduce lead time by 50%
  • Achieve world-class OEE
  • Enter a new market






2. Annual Objectives



These break down long-term goals into 1-year targets.


Example:


  • Reduce lead time by 15% this year






3. Tactical / Operational Goals



These translate strategy into:


  • Department goals
  • Team actions
  • Daily work


Comments

Popular posts from this blog

The True Architecture of LEAN: Why Eliminating Variability Is the Secret to Scalable Growth

The Ultimate Lean Paradox: Why Stopping the Line is the Only Way to Keep It Flowing

Preempting Chaos: The Lean Approach to FMEA (Failure Mode and Effects Analysis)